~All the cabinets (save one high cabinet) are up on the interior wall and the fridge is here (though clearly not pushed in all the way.
~ All the bottom cabinets are in on the exterior wall - and the slide in range is in place.

The kitchen is still totally gutted, right now they seem to be replacing one of our structural beams that support the ceiling of the kitchen. This was a planned repair as the carpenter didn’t think the old one was sufficient or installed properly. In addition it allows us to raise the ceiling height a few more inches. Steve can correct me if I am wrong on any of those details. We also had some collateral damage from all the pounding. One of the tiles (luckily hidden behind the toilet) in our upstairs bath broke in multiple pieces and fell off the wall, and a small piece of plaster in the dining room that abuts that ½ bath that is gutted feel off. Given the plaster is 80 years old and the interior wall there appears to be only 1-2 inches deep, I can’t say I am shocked.
We are right now on opposite coasts, but one thing is the same - we are going to be much busier than normal this weekend.
Lauren - work 10-6 Saturday and 8:30-7:30 on Sunday
(I get quite a few breaks and none of it is physically tiring - don't worry!). The major upside to working on the weekend is I am in lovely weather and from my room at the Hyatt I can see the bay bridge, the old port building and the water. View from my window at 7:20 pacific time: (Sunrise is late here!)
Steve - We have some exciting news - a dumpster is coming a dumpster is coming! Steve has the not enviable job of emptying all our cabinets so they can start ripping out the kitchen. We never got a full-size dining room table, so hopefully we have enough free floor space for all the added pots/pans. Steve also will start painting the nursery.