Saturday, May 19, 2007

Ok, well no floors

BUT, we do have counters installed!






The plumber should be here Monday to hook up the sink/fridge. The floor should be delivered any day (the contractor has been bugging them regularly and they are dragging their feet apparently). Then it has to "season" for 2-3 days before being installed, apparently. Hopefully that means the floor can be done this week. I am hoping that the week of Memorial Day it will be all done.

This week, besides the counters, all the trim around the doors and windows was installed. Other than that we are waiting on the floors and the replacement cabinet to show up so the final touches can be done in the area above/next to the range.